ALMA Service NO

Service

Bathroom renovation

The whole wet room built up layer by layer — from strip-out to the last grouted tile.

About the work

What the job actually involves.

When the whole bathroom is being redone, the layers depend on each other: the substrate sets the fall, the fall decides where water goes, the membrane keeps it there, and the tile goes on last. Having one firm across all four means nobody can blame the previous trade.

We take the whole build-up of the wet room, with one contact person from site visit to handover. You get a schedule with the quote, and documentation of everything under the tile when we finish.

  • Strip-out and preparation
  • Levelling, membrane, masonry and tile
  • One contact person throughout
  • Documentation at handover

Price

How the price is set.

A complete wet room normally takes three to five weeks, much of it drying time that cannot be shortened. The price depends on size, tile choice and how much has to be rebuilt.

We take jobs in Oslo, Bærum and Asker.

Tell us about your project.

Send us a few lines about what you need and we will get back to you, normally within 24 hours.