Service
Bathroom renovation
The whole wet room built up layer by layer — from strip-out to the last grouted tile.
About the work
What the job actually involves.
When the whole bathroom is being redone, the layers depend on each other: the substrate sets the fall, the fall decides where water goes, the membrane keeps it there, and the tile goes on last. Having one firm across all four means nobody can blame the previous trade.
We take the whole build-up of the wet room, with one contact person from site visit to handover. You get a schedule with the quote, and documentation of everything under the tile when we finish.
- Strip-out and preparation
- Levelling, membrane, masonry and tile
- One contact person throughout
- Documentation at handover
Price
How the price is set.
A complete wet room normally takes three to five weeks, much of it drying time that cannot be shortened. The price depends on size, tile choice and how much has to be rebuilt.
We take jobs in Oslo, Bærum and Asker.
See also
Other services and areas.
- TilingTile on floors and walls in every format — on a substrate built to hold it there.
- Waterproof membraneThe layer that keeps water where it belongs. A mistake here is the most expensive one in the room.
- Floor levellingA flat floor with the correct fall to the drain. Without it grout cracks and water stands.
- MasonryWalls, shower niches, benches and built-ins that take both the moisture and the weight of the tile.
- Tradesman in OsloTiling, masonry, levelling and membrane in Oslo.
- Tradesman in BærumTiling, masonry, levelling and membrane in Bærum.
- Tradesman in AskerTiling, masonry, levelling and membrane in Asker.
Tell us about your project.
Send us a few lines about what you need and we will get back to you, normally within 24 hours.